Skip to Content
Project

From plan to successful IMPLEMENTATION in Serbia

Duration: N/A
Status: Completed

In Serbia we were successful in going from a waste management plan to implementing major changes within a local municipalities entire waste management structure so that the plan could be more easily implemented and user friendly.

"You are part of our success and you have contributed a lot to our company's prosperity" 

Vera Blagojević Waste Manager Director Cajetina, Serbia

Results

  • Status-enhancing work by offering training and personal protective equipment (PPE) for those who work out in the field.
  • Purchased a new fleet of garbage collection vehicles.
  • Built a new workshop for maintenance of the garbage trucks.
  • Built a new office that is better suited for the new organization.
  • Built the first new environmental garbage rooms in Serbia.
  • Implemented a collection system for construction and demolition waste.
  • Implemented a system for the collection of packaging materials from the local municipalities resident households.
  • Preparations and development of a new recycling yard.

The next step is to build a composting facility to take care of all the Bio-waste. The structure has been developed by us.

© 2023 IR. All rights reserved • Integrity and cookies.